Ash House, Staines

Contractor: ISG PLC
Architect: Comprehensive Design Architects
Location: Staines
Balconies: 34 Cassettes® and 7 Juliet Balconies

Easy to put in, site presented no issue. Any queries were resolved promptly

Site Manager – ISG PLC

Challenge

A regeneration project which saw an old office block converted into 41 residential apartments. Unlike a new build, it was not possible for brackets to be cast in because the slab and façade had already been completed. This project also included a very narrow balcony projection and anodised fascias and soffits.

Solution

We used post-fixed brackets through the existing slab and specialist lifting equipment to ensure the safe handling and install of balconies. For the fascias and soffits, a special aluminium grade was used, giving more consistency for anodising.

Installation process

Step 1: Post-fixed brackets were fixed through the existing slab. These were the back filled with grout to ensure voids didn’t affect the structural performance.

Step 2: The balconies were manufactured at our production facility in Winchester, where they were stored until required on-site.

Step 3: As the balconies were relatively narrow, they were transported to site sitting in pairs side by side to minimise transport movements.

Step 4: Using specialist lifting equipment ensured safe handling of the final installation. A tree close to the building meant that the lifting operations were very tricky, so very long chains had to be used from the counterbalance.